The orders of solar mounting deliveried as scheduled 2023-01-13

As soon as China's "Opening" policy on COVID prevention and control came out, the whole Chinese almost be infected overall. All this time, everyone was in the process of "infected-heavy sick-recover but still weak". Because the outbreak happened just before CNY holiday, many workers asked for sick leave and factories struggled.

 

In this difficult situation, to live up to customers' expectations, all the staffs of Sunforson adopted the mode of “leaving – work shift” rotation, and tried their best to push the production, and ensure all the orders catch up with the vessel that depart before the CNY.

 

If you need solar panel mounting structure, please feel free to contact Sunforson team. The delivery time of the solar roof mount is about 2-3 weeks, and the delivery time of the solar ground mount and solar carport structure is about 4-5 weeks. However, January 21 to January 27 is the Lunar New Year, so the delivery time should be deducted these 7 days. Wish you all a happy New Year and enjoy a holiday with full of love, laughter and warmth.


hot products
  • Concrete base solar ground mounted

    SunRack Concrete Based Ground Mounting

    SunRack concrete base solar mounting is a highly versatile ground mounted solutions that can be widely applied in commercial and utility solar panel installation

  • carport mounting structure

    Solar Car Park Mounting System

    SunRack solar car parking solar rack mount can be designed as single row and double row two version. It adopts triangle supporting structure technology, which is very strong and secure.

  • Solar Panel Installation Mounting

    Solar Ballast Mounting System

    SunRack ballast mounting system adopts foldable triangular to save cost both on installation and transportation. Non-penetration to rooftop.

welcome to Sunforson
If you have questions or suggestions,please leave us a message,we will reply you as soon as we can!
   

online service

home

products

about

contact